About Project
                                        
                                    
                                    
                                        
                                            
                                                Investor
                                            
                                            
                                                Vinh Phuc Department of Transportation.
                                            
                                        
                                        
                                            
                                                Project location
                                            
                                            
                                                Vinh Yen City (Vinh Phuc)
                                            
                                        
                                        
                                            
                                                Implementation time
                                            
                                            
                                                28/12/2022
                                            
                                        
                                        
                                            
                                                Category
                                            
                                            
                                                Bridges - Tunnels
                                            
                                        
                                     
                                    
                                        Nguyen Tat Thanh Bridge with the design idea of “Dance of the Cranes” architecture, was built to cross the Hanoi - Lao Cai railway (at Km55+200) within the intersection with Nguyen Tat Thanh street, Vinh Yen city. The total length of the project is 752m, with the bridge width being 22.5m, of which the bridge length is 368.6m. The total investment for the project is 488 billion VND.
The bridge has a cable-stayed structure with one plane of cables in an asymmetric span, the single stylized tower simulates the shape of a pair of dancing cranes with the tower height from the bridge surface being 56m. The span structure diagram is 2x30 + 80 + 100 + 4x30m, in which the 2 main spans arrange thick cables of 80m (8 cables) and 100m (10 cables). The bridge beam uses a composite steel box girder with a concrete deck with a beam height of 2.37m. The pile foundation structure uses bored piles with a diameter of 1.2 ~ 1.5m.