About Project
Investor
Trung Nam Tra Vinh 1 Wind Power Joint Stock Company
Project location
Duyen Hai district (Tra Vinh)
Implementation time
01/02/2021
Category
Recycled Energy
Dong Hai 1 Wind Power Plant (V1-7) has a capacity of 100MW, invested in the form of BOO (Build - Own - Operate), the project investor is Trung Nam Tra Vinh 1 Wind Power Joint Stock Company - TrungNamGroup.
The main items of the plant are the construction and installation of 25 wind turbines with a rated capacity of 4MW, the rotor diameter is 150m with a tower height of 105m;
In addition, the plant also has items such as a 33/220kV transformer station with a capacity of (2x75)MVA; The bridge system and the network of 33kV cables on the sea connect the wind turbines to the 33/220kV transformer station; The 220kV transmission line from the 33/220kV transformer station of the plant to the connection point with the national power grid at the 220kV Trung Nam Solar Power Plant station and other infrastructures.